Kamyanske

Several measures are proposed for the project in Kamyanske. They will be optimized during the preparation phase and may include reconstruction of a boiler house with total capacity of about 6.5 MW, including installation of new condensing gas boilers; replacement and optimization of approximately 1 km of district heating pipes; IHS installations in 9 major buildings (5-9 floors) in the district; installation of heat meters and control equipment in 51 other buildings (1-2 floors) in the district.
The proposed project could result in reduction of the gas consumption with 25-30%. In addition the electric energy for internal use will be reduced.
Update February 2016