The project of “Chernivtsiteplokomunenergo” includes close down of a boiler house, situated in the basement of a residential building and connection of the heat load (10 multi-storey buildings) to another boiler house (serving 17 multi-storey buildings). Chernivtsi boiler houseIn this boiler house a 2.5 MW wood pellets boiler will be installed. Also pre-insulated pipes will be installed and the 4-pipe system will be converted to a 2 pipe demand driven system. Also individual heating substations will be installed, in first hand in public institutions connected to the interconnected heating area.

The project is estimated to result in a total reduction of the energy use of 8% and a reduction of gas consumption with more than 80%.

The project should be completed before the start of the heating season 2019/2020.

Updated November 2018