July 2018 – The Business Plan for the DemoUkrainaDh demonstration project of Municipal Company “Pavlohradteploenerho” has been approved. The proposed project involves connection of the 4th City Hospital to a larger District Heating system. For the preparation of domestic hot water solar panels will be installed on the roof. Furthermore, a remotely located residential area will be disconnected and instead a local biomass boiler will be installed, using gas for peak and reserve purposes. Piping network will be partially replaced. These investments will dramatically reduce the use of fossil fuels in the system.