The project in Pavlohrad includes the following components:The project in Pavlohrad includes the following components:

  • Disconnection of the buildings at T Fedorovoi street from the current district heating system, removal of the existing pipeline from boiler house no 5 and installation of new boilers (pellets and gas) in a container solution. The buildings will have equipment installed to be able to control their energy supply. 
  • Connection of the boiler house of the 4th City Hospital to the district heating system and installation of a solar energy solution at the building roof combined with a backup boiler.
  • Replacement of piping network.
  • Installation of a modern individual heat substation in the 9-storey building.

 Hospital 4 will be connected to the district heating system


The proposed project could result in reduction of the gas and electricity consumption with on average 20 %. By the solar panels the use of fossil fuels for the production of Domestic Hot Water will be reduced substantially.

Update July 2018